ENERGY
RO

Feasibility studies › Solar park feasibility study

Technology · from 2.500 €

Solar park feasibility study

Technical and economic documentation under HG 907/2016Government Decision 907/2016 (HG 907/2016)The Romanian regulation that sets the mandatory content of technical and economic documentation.Read more ›, with at least two compared scenarios and a cost-benefit analysis. Signed by ANRE-licensed designers.

from 2.500 €excl. VAT
20 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

Schemă monofilară, parc fotovoltaic 1 MW Șir module 24 × 620 Wp Șir module 24 × 620 Wp Șir module 24 × 620 Wp c.c. · 1.100 V Invertoare 4 × 250 kW 800 V Tablou general protecții Trafo 1.000 kVA 0,8 / 20 kV punct de delimitare Rețea LEA 20 kV conform ATR

glisează lateral pentru desenul complet

Schema monofilară face parte din părțile desenate ale studiului. Valorile de mai sus sunt un exemplu pentru un parc de 1 MW; configurația reală rezultă din analiza de racordare și din avizul tehnic emis de operatorul de rețea.
Bilanț energetic lunar, parc fotovoltaic 4.176 kWp 0 200 400 600 800 0,80 0,85 0,90 Ian Feb Mar Apr Mai Iun Iul Aug Sep Oct Noi Dec 785 MWh livrați în rețea raport de performanță

glisează lateral pentru desenul complet

Bilanțul energetic lunar pentru un parc de 4.176 kWp în nordul Dobrogei, simulat în PVsyst cu an meteorologic tipic. Total anual 5.770 MWh, adică 1.382 kWh pentru fiecare kWp instalat, cu un raport de performanță de 0,849 pe an. Linia de sus arată raportul de performanță lunar: cel mai bun în martie, cel mai slab la temperaturile de vârf ale verii și în decembrie.
Amortizarea investiției, 1 MWp -800 -400 0 +400 +800 +1200 an 0 an 5 an 10 an 15 an 20 prag de rentabilitate · anul 7,4 mii € cumulat

glisează lateral pentru desenul complet

Graficul de amortizare arată când investiția se întoarce. Exemplu pentru 1 MWp, cu 700.000 € investiți și 95.000 € venit net anual: pragul e atins în anul 7,4. Studiul calculează aceeași curbă în trei scenarii, inclusiv unul prudent, fiindcă finanțatorii se uită la cel prudent.

Pricing

Putere instalatăFee fromLead time
under 1 MW2.500 €20 days
1 – 5 MW4.500 €25 days
5 – 20 MW8.000 €35 days
over 20 MWcustom quote—

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

Written parts

  • General data: site, beneficiary, legal status of the land, fit with the urban planning documents.
  • Existing situation and need for the investment: solar resource from validated sources, target consumption or market, environmental and grid constraints.
  • At least two compared technical and economic scenarios: installed capacity, module and inverter technology, fixed structure or tracker, connection option.
  • PVsystPVsystThe industry standard software for detailed simulation of a solar park's output.Read more › yield simulation for the recommended scenario, with a typical meteorological year, losses and shading modelled.
  • General estimate and per-object estimates in the HG 907/2016 structure.
  • Cost-benefit analysis: 25-year cash flow, NPV, IRR, payback period, sensitivity to energy price and capital cost.
  • Implementation schedule and the list of permits required.

Drawings

  • Location plan and site plan on the topographic survey.
  • Layout plan with module rows, inverters, transformer stations and access roads.
  • Single-line electrical diagram from the module strings to the point of delimitation.
  • Route of the power line to the connection substation, where applicable.
  • Typical details for the mounting structure and the fence.

What you send us

  • Land registry extract and cadastral plan of the site.
  • Urban planning certificate, if you have one; otherwise we obtain it under power of attorney.
  • Grid connection permit (ATRGrid connection permit (ATR)The document by which the network operator confirms that you may connect a given capacity at a given point.Read more ›), if you have it; otherwise we include it as an assumption and prepare the connection study separately.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Is a feasibility study the same as a grid connection study?

No. The feasibility study compares at least two technical and economic scenarios and supports the investment decision. The connection study analyses only the grid connection and is the basis for the technical connection permit. Many projects need both, in that order.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead