Documentation · from 3.500 €

Feasibility study, HG 907/2016

Technical and economic documentation in the structure required by HG 907/2016Government Decision 907/2016 (HG 907/2016)The Romanian regulation that sets the mandatory content of technical and economic documentation.Read more ›, with general estimate, technical and economic indicators and at least two scenarios.

from 3.500 €excl. VAT
25 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

HG 907/2016 study: chapter structure 1 1. General data 2 2. Existing situation 3 3. Scenarios (min. 2) 4 4. Costs: general estimate 5 5. Analysis, sensitivity, risks 6 6. Recommended scenario 7 7. Implementation 8 8. Conclusions chapters in the order of annex 4 · width ≈ share of pages drawings: location plan · site plan · general plans · sections · diagrams

scroll sideways for the full drawing

The structure is set by law and checked by the funding body word for word. Chapters 3 and 5 make up half the document: that is where scenarios are compared and indicators calculated. A study rejected for funding almost always has a single real scenario and a missing or decorative sensitivity analysis.

Pricing

Valoarea investițieiFee fromLead time
under €1 million3.500 €25 days
€1 – 3 million5.500 €30 days
over €3 millioncustom quote—

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

Written parts, in the order required by annex 4 to HG 907/2016

  • General information on the investment objective: name, ordering party, beneficiary, author.
  • Existing situation and need for the investment: conclusions of the pre-feasibility study or concept note, context, analysis of the existing situation, expected objectives.
  • Identification, proposal and presentation of at least two technical and economic scenarios, with site particularities and the description of buildings, installations and equipment for each scenario.
  • Estimated investment costs: general estimate and per-object estimates, per scenario; operating and maintenance costs.
  • Analysis of each scenario: financial and economic performance indicators, sensitivity analysis, risk analysis.
  • Recommended scenario: description, advantages, main technical and economic indicators, implementation schedule.
  • Implementation of the investment: the responsible entity, implementation, operation and maintenance strategy.
  • Conclusions and recommendations.

Drawings

  • Location plan, site plan, general plans, characteristic sections and elevations.
  • Main plans of the buildings and installations, at study level.

What you send us

  • The design brief or a description of what you want to achieve.
  • Site documents, the urban planning certificate if available, ground surveys if already done.

Note: this is the general form of the study, for any type of investment. For solar parks, storage or charging stations we use the same structure, completed with the energy-specific part.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead