ENERGY
RO

Feasibility studies › DALI documentation

Documentation · from 2.500 €

DALI documentation

Documentation for approving intervention works on existing buildings, with expert assessment, intervention scenarios and estimate.

from 2.500 €excl. VAT
25 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

DALI: intervention scenarios compared 0 % 50 % 100 % 100 % — No intervention 71 % 38 % S1 · minimal refurbishment payback 9.3 yrs 34 % 62 % S2 · full refurbishment + PV payback 8.1 yrs energy use vs today cost vs the maximum scenario

scroll sideways for the full drawing

DALI compares intervention scenarios, it does not describe one solution. The example shows why the more expensive scenario can be the recommended one: the larger energy saving pays it back faster than the minimal variant. The technical assessment and energy audit are the inputs; scenarios and estimate are the outputs.

Pricing

Valoarea investițieiFee fromLead time
under €1 million2.500 €25 days
€1 – 3 million4.000 €30 days
over €3 millioncustom quote—

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

Written parts, in the structure of annex 5 to HG 907/2016

  • General information on the investment objective.
  • Existing situation: description of the building, technical condition from the expert assessment, energy audit conclusions if the intervention targets energy efficiency.
  • Proposed situation: at least two intervention scenarios, description of the works for each, in line with the conclusions of the technical assessment.
  • Estimated costs: general estimate and per-object estimates, per scenario.
  • Technical and economic indicators, simplified sensitivity analysis and the recommended scenario.
  • Implementation schedule, funding sources, list of permits.

Drawings

  • Survey of the existing building: plans, sections, elevations.
  • Plans of the proposed interventions, at approval level.

What you send us

  • Building documents and, if available, the technical book or the original design.
  • The technical assessment and the energy audit, if already done; otherwise we arrange them with certified experts, at separate cost.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead