ENERGY
RO

Feasibility studies › Battery storage feasibility study

Technology · from 3.500 €

Battery storage feasibility study

Feasibility study for energy storage installations, with modelled revenues from arbitrage, ancillary services and the balancing market.

from 3.500 €excl. VAT
25 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

Storage: the daily arbitrage cycle 0 50 100 150 200 00:00 06:00 12:00 18:00 23:00 EUR/MWh · day-ahead charge 4 h · ~30 EUR/MWh discharge 4 h · ~170 EUR/MWh spread ≈ 140 EUR/MWh

scroll sideways for the full drawing

Day-ahead arbitrage is the first revenue stream modelled in the study: the battery buys at noon, when solar pushes the price down, and sells in the evening. Example for a summer day; the study runs all 8,760 hours of a historical year, adds ancillary services and the balancing market, and subtracts cell degradation.
Schemă monofilară, parc fotovoltaic 1 MW Șir module 24 × 620 Wp Șir module 24 × 620 Wp Șir module 24 × 620 Wp c.c. · 1.100 V Invertoare 4 × 250 kW 800 V Tablou general protecții Trafo 1.000 kVA 0,8 / 20 kV punct de delimitare Rețea LEA 20 kV conform ATR

glisează lateral pentru desenul complet

Schema monofilară face parte din părțile desenate ale studiului. Valorile de mai sus sunt un exemplu pentru un parc de 1 MW; configurația reală rezultă din analiza de racordare și din avizul tehnic emis de operatorul de rețea.

Pricing

CapacitateFee fromLead time
under 10 MWh3.500 €25 days
10 – 30 MWh5.500 €30 days
30 – 60 MWh8.000 €35 days
over 60 MWhcustom quote—

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

Written parts

  • General data: site, legal status, urban planning fit, distances to the connection substation.
  • Installation sizing: power (MWMegawatt (MW)One thousand kilowatts. The usual unit for energy parks.Read more ›) and capacity (MWhMegawatt-hour (MWh)One thousand kilowatt-hours. The unit in which electricity is traded on the wholesale market.Read more ›), discharge duration, cycles per year, cell degradation over the lifetime.
  • Revenue modelling on the accessible markets: day-ahead arbitrage, ancillary services (FCR, aFRR), balancing market; conservative, base and optimistic scenarios.
  • Connection analysis: injection and absorption power, the operator's requirements for storage installations.
  • HG 907/2016Government Decision 907/2016 (HG 907/2016)The Romanian regulation that sets the mandatory content of technical and economic documentation.Read more › general estimate: battery containers, PCS, transformers, connection, fire suppression, installation.
  • Cost-benefit analysis: 15-year cash flow, NPV, IRR, sensitivity to price spread and degradation.
  • Environmental, fire safety and operating requirements.

Drawings

  • Layout plan with the BESSBattery energy storage system (BESS)A facility that stores electricity in batteries and returns it to the grid when needed.Read more › containers, PCS units, transformer and technical room.
  • Block electrical diagram and single-line diagram to the point of delimitation.
  • Foundations and platforms plan, with characteristic sections.
  • Fencing, exterior lighting and lightning protection plan.
  • Site organisation plan.

What you send us

  • Land documents and, if available, the connection permit or the connection study.
  • The intended operating strategy, if you already have a trading partner.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead