Feasibility studies › Frequently asked questions
7 întrebări
Răspunsurile la ce ne întreabă clienții cel mai des, înainte de a comanda un studiu.
PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.
Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.
Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.
No. The feasibility study compares at least two technical and economic scenarios and supports the investment decision. The connection study analyses only the grid connection and is the basis for the technical connection permit. Many projects need both, in that order.
Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.
We answer clarification requests at no extra cost, for documentation we prepared.
By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.
Scrie-ne și îți răspundem în maximum 24 de ore lucrătoare. Dacă vrei doar un preț, configuratorul ți-l dă în două minute.